Site Readiness
Review floor loading, egress, circuits, data drops and service clearances.
Service scope begins with a documented equipment list, site-readiness record and named acceptance owner.

Background: A temporary bank of networked machines must be stable across repeated sessions. Process: Freeze versions, label circuits, test recovery and name reset authority. Result: The operator receives an auditable start-of-day checklist; no uptime claim is made without event data.
Background: A compact zone shares building utilities and guest circulation. Process: Map sound, ventilation, aisle and closing-hour access before selecting cabinets. Result: Procurement proceeds with documented space exclusions and service paths.
Background: Multiple sites need repeatable swaps. Process: Standardize images, configuration records, spares and rollback steps. Result: Site variance is visible before dispatch rather than discovered during installation.
Provide the equipment schedule, site drawings, event date and current utility plan.